亚洲女同成AV人片在线观看,中文乱码在线播放亚洲,久久真人毛片免费视频,国产a三级久久精品

<strike id="unh6a"><dfn id="unh6a"><option id="unh6a"></option></dfn></strike>

<button id="unh6a"></button>

<button id="unh6a"></button>

<button id="unh6a"><xmp id="unh6a">

<button id="unh6a"><xmp id="unh6a">

<button id="unh6a"></button>

<button id="unh6a"></button>
<strike id="unh6a"></strike>

The first pilot project in Keqi

Date: 2024.02.23

Ming Yang has set itsfirst pilot project of Keqi in Inner Mongolia by using the MySE 3.0MW hybriddrive series. This project contains 17 wind turbines. The annual mean windspeed there is about 7.68m/s.The total generation has reached 153 million kWhuntil Nov.14th of 2018 has extensivly overfilled the planned one from the startof the year as 140million kWh.